Skip to content
PoolBuilderIndex

How Much Does a Pool Renovation Cost in Toronto?

Last updated:By The Pool Trade Desk

A backyard pool after dark with newly laid pale coping and a new dark stone paver deck around it, the underwater lights on, mature shrubs and a weathered board fence behind it almost black against a night sky.

A resurface, a liner replacement and a full conversion are three different jobs, and a quote only means something once you know which one you are being given. Researched pricing puts full pool makeover (liner, deck, coping and equipment bundled) at $20,000 to $50,000 per project (CAD), per Swimpool 360 (Toronto and GTA), and comprehensive renovation (liner, deck, coping, equipment) at $15,000 to $30,000 per project (CAD), per Swimpool 360 (Toronto and GTA). Each row in the table below names its own source, and prices are quoted before tax unless the row says otherwise.

What does each renovation scope cost?

The table

This range rests on 6 independent published sources, and every row below names the one its own figure came from. Where two sources disagree they stay in the table as two rows with two labels; nothing here is an average of the two, and no range was widened to cover a gap.

Canadian dollars, researched August 2026, one named Ontario source per row. Ontario HST sits on top of every figure unless the row says otherwise.

  • Full pool makeover (liner, deck, coping and equipment bundled)

    Typical range
    $20,000–$50,000
    Unit
    per project (CAD)
    Condition
    'Typically', and only where liner, deck, coping and equipment are bundled into one project. The source argues the bundle is the best value precisely because several components need attention at once.
  • Comprehensive renovation (liner, deck, coping, equipment)

    Typical range
    $15,000–$30,000
    Unit
    per project (CAD)
    Condition
    The source offers this as the alternative to replacement, which it puts at $50,000-$100,000+ in the GTA. It is the same scope as the makeover row above, quoted lower in a different section of the same page.
  • Vinyl liner replacement, inground pool

    Typical range
    $3,500–$7,000
    Unit
    per pool (CAD)
    Condition
    'Typically', and it moves with pool size and liner pattern. This is the GTA figure from a company that sells the service.
  • Vinyl liner replacement, standard inground pool

    Typical range
    $4,500–$8,000
    Unit
    per pool (CAD)
    Condition
    A standard inground pool. The source says size, shape, liner grade and labour all move it, and prices larger or custom pools separately above this.
  • Vinyl liner replacement, larger or custom-shaped pool

    Typical range
    $6,500–$10,000+
    Unit
    per pool (CAD)
    Condition
    Larger pools or custom configurations, and open-ended at the top. The source names vinyl over steel stairs, benches and tanning ledges as what pushes a pool into this band.
  • Vinyl liner replacement (GTA installer quoted range)

    Typical range
    $3,000–$7,000
    Unit
    per pool (CAD)
    Condition
    'Typically', moving with pool size, liner thickness and custom options. The lowest of the three liner ranges on this page.
  • Concrete pool resurfacing

    Typical range
    $6,000–$18,000
    Unit
    per pool (CAD)
    Condition
    Depends on surface type. This is resurfacing, not replastering; a second source on this page prices replastering separately and lower.
  • Concrete pool replastering, installed

    Typical range
    $6,000–$15,000
    Unit
    per pool (CAD)
    Condition
    A recurring cost every 10 to 15 years on a concrete pool, not a one-off upgrade. The same source also puts acid washing at $300-$600 every 2-3 years.
  • Fibreglass gelcoat refinishing

    Typical range
    $3,000–$8,000
    Unit
    per pool (CAD)
    Condition
    Once every 15 to 20 years. The source lists it among the periodic costs a fibreglass pool owner should expect, separate from routine upkeep.
  • Coping replacement only, typical 80 ft perimeter (limestone or porcelain)

    Typical range
    $2,800–$6,500
    Unit
    per pool (CAD)
    Condition
    A typical 80-foot perimeter, and it depends on whether the existing field tile stays in place. Coping only, with no deck work.
  • Pool deck refresh and reseal, existing concrete (600-900 sq ft)

    Typical range
    $3,500–$6,800
    Unit
    per deck (CAD)
    Condition
    For a 600-900 sq ft deck, which the source calls the most common size in GTA backyards. The cheapest option and the shortest-lived: the same table gives it 3 to 5 years.
  • Pool deck full re-pour, stamped concrete (600-900 sq ft)

    Typical range
    $9,000–$15,500
    Unit
    per deck (CAD)
    Condition
    A 600-900 sq ft deck, poured new in stamped concrete. The source gives it 8 to 12 years against 3 to 5 for a reseal.
  • Travertine pavers over existing base (600-900 sq ft)

    Typical range
    $14,500–$22,000
    Unit
    per deck (CAD)
    Condition
    Travertine laid over the existing base on a 600-900 sq ft deck, so no base prep is included. The source gives it 20 to 25 years.
  • New deck with base prep, 20 mm porcelain pavers (600-900 sq ft)

    Typical range
    $19,000–$32,000
    Unit
    per deck (CAD)
    Condition
    Includes base preparation, which is what separates it from the paver row above. The source gives 20mm porcelain 25 to 30 years, the longest life in its table.
  • Pool deck resurfacing

    Typical range
    $5,000–$20,000
    Unit
    per deck (CAD)
    Condition
    Depends on material. A wider band than the deck rows above it because it is not tied to a deck size.
  • Added water feature

    Typical range
    $2,000–$15,000+
    Unit
    per feature (CAD)
    Condition
    'Starts around' $2,000, and open-ended at the top for elaborate designs. Not a range you can land in the middle of by choosing a feature at random.
  • Rock waterfall, installed

    Typical range
    $5,000–$15,000
    Unit
    per feature (CAD)
    Condition
    A rock waterfall specifically. The same source puts a basic spillover from a raised spa or ledge far lower at $1,500 to $4,000.
  • Salt chlorinator conversion, installed

    Typical range
    $1,200–$2,500
    Unit
    per system (CAD)
    Condition
    Installed, for the chlorinator itself. The source's argument for it is running cost: it puts traditional chlorine at $600-$960 a year in chemicals against no upfront cost.
  • Complete pool replacement instead of renovating (comparison)

    Typical range
    $50,000–$100,000+
    Unit
    per project (CAD)
    Condition
    This is the replacement cost the renovation rows are being compared against, not a renovation price. Open-ended at the top.

Which of these numbers is actually big?

The bands

Each bar is one row from the table above, drawn from $0 so the lengths can be compared by eye. 14 of the 19 pool renovation rows are drawn, on 3 separate scales (per pool (CAD), per deck (CAD), per project (CAD)), because a figure quoted per month and a figure quoted per project are not the same measurement and must not share an axis. The widest published band on this guide is full pool makeover (liner, deck, coping and equipment bundled), at $20,000 to $50,000.

per pool (CAD)7 rows, $2,800 to $18,000
  • Coping replacement only, typical 80 ft perimeter (limestone or porcelain)

    $2,800–$6,500

  • Vinyl liner replacement (GTA installer quoted range)

    $3,000–$7,000

  • Fibreglass gelcoat refinishing

    $3,000–$8,000

  • Vinyl liner replacement, inground pool

    $3,500–$7,000

  • Vinyl liner replacement, standard inground pool

    $4,500–$8,000

  • Concrete pool replastering, installed

    $6,000–$15,000

  • Concrete pool resurfacing

    $6,000–$18,000

$0$18,000
per deck (CAD)5 rows, $3,500 to $32,000
  • Pool deck refresh and reseal, existing concrete (600-900 sq ft)

    $3,500–$6,800

  • Pool deck resurfacing

    $5,000–$20,000

  • Pool deck full re-pour, stamped concrete (600-900 sq ft)

    $9,000–$15,500

  • Travertine pavers over existing base (600-900 sq ft)

    $14,500–$22,000

  • New deck with base prep, 20 mm porcelain pavers (600-900 sq ft)

    $19,000–$32,000

$0$32,000
per project (CAD)2 rows, $15,000 to $50,000
  • Comprehensive renovation (liner, deck, coping, equipment)

    $15,000–$30,000

  • Full pool makeover (liner, deck, coping and equipment bundled)

    $20,000–$50,000

$0$50,000

5 of the 19 rows above are not drawn, because a bar would say something the source did not.

  • Vinyl liner replacement, larger or custom-shaped pool $6,500–$10,000+. No closed upper figure, so the right-hand end of a bar would be invented.
  • Added water feature $2,000–$15,000+. No closed upper figure, so the right-hand end of a bar would be invented.
  • Complete pool replacement instead of renovating (comparison) $50,000–$100,000+. No closed upper figure, so the right-hand end of a bar would be invented.
  • Rock waterfall, installed $5,000–$15,000. The only figure quoted “per feature (CAD)”, and one bar on its own axis compares nothing.
  • Salt chlorinator conversion, installed $1,200–$2,500. The only figure quoted “per system (CAD)”, and one bar on its own axis compares nothing.

Which renovation are you actually being quoted?

Three scopes

The opening line of this guide is that a resurface, a liner replacement and a full conversion are three different jobs. They are laid out here in the order a quote usually grows through them, because the word on the estimate is the same in all three cases.

The surface only

One trade, in and out. This is what most people mean when they say the pool needs doing.

  • Vinyl liner replacement, standard pool

    $4,500–$8,000 per pool (CAD)

    A wear part. The liner is the surface, not the structure.

  • Concrete replastering

    $6,000–$15,000 per pool (CAD)

  • Fibreglass gelcoat refinishing

    $3,000–$8,000 per pool (CAD)

    The fibreglass equivalent of replastering a concrete pool.

plus

The edge and the deck

A separate job from the pool. This guide's cost factors turn on whether the deck footprint changes, not on the material alone.

  • Coping replacement on its own

    $2,800–$6,500 per pool (CAD)

    Replacing the top edge is a different job from replacing the deck around it.

  • Same footprint, refreshed and resealed

    $3,500–$6,800 per deck (CAD)

  • New deck, new base, porcelain pavers

    $19,000–$32,000 per deck (CAD)

    The same 600 to 900 sq ft as the row above it. The difference is the base prep, not the area.

or, all together

Everything at once

Bundled, and the point at which the comparison stops being with a repair and starts being with a new pool.

  • Comprehensive renovation: liner, deck, coping, equipment

    $15,000–$30,000 per project (CAD)

  • Replacing the pool instead of renovating it

    $50,000–$100,000+ per project (CAD)

    Carried in the table as a comparison row, which is why it has no closed upper figure.

Built from the price rows above, their conditions, and this guide's cost factors. The bundling claim on the right is the first cost factor on this page.

What drives the price?

Variables

Size, access and what has to be rebuilt to reach the pool move a pool renovation quote more than anything else in Toronto. Each line below is one of those variables, with the published figure that shows how far it moves the total.

  • Scope bundling: a liner alone runs $2,500 to $10,000 across Ontario sources, while liner plus deck plus coping plus equipment reaches $15,000 to $30,000 (Swimpool 360)
  • Deck material: stamped concrete $9,000 to $15,500 versus porcelain pavers with base prep $19,000 to $32,000 for the same 600 to 900 sq ft deck (905 Reno)
  • Whether the deck footprint changes: 905 Reno prices a same-footprint refresh at $3,500 to $6,800 against $19,000 to $32,000 for a new deck with base prep
  • Liner grade: Hipel Pools states premium liners cost 15 to 30 percent more than standard 20 mil liners
  • Pool size and shape: Hipel Pools quotes $6,500 to $10,000 and up for larger or custom-configured pools against $4,500 to $8,000 standard
  • Coping condition: replacing coping alone costs $2,800 to $6,500 for a typical 80 ft perimeter (905 Reno)
  • Equipment modernisation: a salt chlorinator conversion runs $1,200 to $2,500 installed (Project Landscaping)
  • Added features: water features start around $2,000 and reach $15,000 and up (Swimpool 360)

What's specific to Ontario and Toronto?

Local rules

Ontario adds 13 percent HST on top of every quote, Toronto requires a pool fence enclosure permit before anyone digs, and the freeze-thaw cycle decides what survives the winter. Those three are what a national price guide leaves out.

  • A renovation that changes the enclosure can pull you back into the permit process. City of Toronto Municipal Code Chapter 447 requires a pool fence enclosure permit, the fee is $198.59 per application under Chapter 441, and Toronto requires an approved Zoning Certificate first. Confirm with the City before you remove an existing fence as part of a deck rebuild.
  • Ontario's freeze and thaw cycles are the reason most GTA pool decks need work at all. 905 Reno frames its 2026 guide around pre-summer deck renovation and notes most refresh projects need 5 to 10 days on site, which is why spring booking fills early.
  • Porcelain pavers are 905 Reno's stated dominant 2026 premium choice in the GTA because they are frost-proof and scratch-resistant, which matters more here than in milder climates.
  • Ontario HST is 13 percent. None of the Ontario renovation sources we checked state whether their quoted ranges include it, so confirm before comparing.
  • Renovation season in the GTA is tied to the pool season. Categories on this site list pool renovation as an April to October trade, so a liner or deck job booked in mid-summer will often be scheduled for the following spring.

How can I pay less?

Levers

The biggest saving is almost always timing and bundling rather than choosing a cheaper material. Each lever below is tied to a published figure from the table, so you can see what it is actually worth before deciding it is worth doing.

  • Renovate rather than replace where the shell is sound. Swimpool 360 puts a comprehensive renovation at $15,000 to $30,000 against $50,000 to $100,000 and up for a full replacement.
  • Bundle liner, coping and deck into one visit. 905 Reno specifically flags that a new deck installed over tired coping creates a $4,000 problem you will pay for later.
  • Keep the deck footprint. A same-footprint refresh and reseal at $3,500 to $6,800 avoids the base prep that pushes a new deck to $19,000 to $32,000 (905 Reno).
  • Swap to a variable-speed pump during the renovation while the equipment pad is already open. Swimpool 360 puts the saving at $600 to $1,200 a year with payback in 2 to 3 seasons.
  • Ask for a standard 20 mil liner unless you have a reason not to. Hipel Pools states premium liners cost 15 to 30 percent more.
  • Book in the shoulder of the season. Renovation crews in the GTA work an April to October window, so a job quoted in October for spring start avoids competing with peak demand.

How did we research these numbers?

Provenance

Every figure above was re-read in the document it is attributed to, and the exact sentence carrying it is recorded against the row. Where a number could not be found in the source it named, the row came out rather than the number being adjusted to fit. Here is what PoolBuilderIndex found across the 6 sources.

  • Renovation is far cheaper than replacement in the GTA. Swimpool 360 puts a comprehensive renovation covering liner, deck, coping and equipment at $15,000 to $30,000, a full makeover at $20,000 to $50,000, and a complete pool replacement at $50,000 to $100,000 and up.
  • Liner replacement quotes vary more than you would expect for a standard job. Swimpool 360 quotes $3,500 to $7,000 on its renovation page but $2,500 to $5,000 on its liner repair page, Nebo's Pools advertises from $4,500 and states $3,000 to $7,000 in its FAQ, and Hipel Pools in Kitchener quotes $4,500 to $8,000 rising to $6,500 to $10,000 and up for larger or custom shapes. Across those Ontario sources the honest range is roughly $2,500 to $10,000.
  • Deck work is usually the biggest single line in a pool renovation, not the pool itself. 905 Reno prices a 600 to 900 sq ft deck at $3,500 to $6,800 for a refresh and reseal, $9,000 to $15,500 for a stamped concrete re-pour, $14,500 to $22,000 for travertine pavers over an existing base, and $19,000 to $32,000 for a new porcelain deck with base prep.
  • Coping and deck are best done together. 905 Reno warns that installing a new porcelain deck against tired limestone coping leaves you with a '$4,000 problem' later, and prices coping replacement alone at $2,800 to $6,500 for a typical 80 ft perimeter.
  • Equipment upgrades can partly pay for themselves. Swimpool 360 states variable-speed pumps save $600 to $1,200 annually on electricity and pay for themselves within 2 to 3 seasons. GBI Pools reports Ontario owners save $300 to $500 per year on hydro after the same swap.
  • Resurfacing intervals differ by shell. Easy Pools says concrete pools need resurfacing every 10 to 20 years at $6,000 to $18,000 and fibreglass gelcoat refinishing every 15 to 20 years at $3,000 to $8,000, while Hipel Pools puts vinyl liner life at 8 to 12 years.

Sources

Who can do the work?

The shortlist/3 of 65 shown

PoolBuilderIndex tracks 65 pool renovation companies across the Greater Toronto Area, rated 4.69★ on average. The three below rank highest on our published score, based on PoolBuilderIndex's analysis of 65 GTA businesses, August 2026.

  • Pinnacle Pool, photographed at its own listing

    Pinnacle Pool

    5.0★ rating · 83 Google reviews

    80/100 score

    Nestleton Station · Pool Repair

    • Says it is insured
    • Says it is a member of the Pool & Hot Tub Council of Canada
  • Stone Landscaping & Pools, photographed at its own listing

    Stone Landscaping & Pools

    5.0★ rating · 15 Google reviews

    80/100 score

    Islington-City Centre West · Pool Builders

    Monday: 8 a.m.–8 p.m.

    • Says it is licensed
    • Says it is insured
  • WEST COVE POOLS, photographed at its own listing

    WEST COVE POOLS

    4.9★ rating · 343 Google reviews

    74/100 score

    Oshawa · Pool Builders

    Monday: 9 a.m.–5 p.m.

    • Says it has been going since 2008
See all 65 pool renovation companies on PoolBuilderIndex

Who else does this work, in their own pictures?

Their own photographs/ranks 4 to 9 of 65

Not stock photography, and not ours: every picture below was taken by the company named on it and carries whatever that company chose to photograph, which for some is a finished backyard and for others is the vans. These are the next 6 pool renovation companies down the same ranking as the shortlist above, carrying 26 pictures between them, and the largest tile belongs to whichever of the six has the most on file here: Vinyl Masters Inc., with 6. Open one for the rest of that company’s pictures, its hours and its number.

See every pool renovation companie company and its own photographs

What will it cost for my own pool?

Calculators

Put your own dimensions in and these work it out from the same researched figures as the table above. Every answer shows the arithmetic and names the source it multiplied, so you can check it rather than take it.

What do these trade terms mean?

Definitions

These are the words a quote for pool renovation will use without explaining them. Each one below is defined as this page uses it, so a line on an estimate can be read for what it is rather than guessed at.

Coping
The capping course of stone, concrete or porcelain that finishes the top edge of the pool wall where it meets the deck. Replacing it is a separate job from replacing the deck around it.
Vinyl liner
A custom-cut waterproof membrane held against a steel or polymer wall panel system by the water behind it. It is the surface, not the structure, and it is a wear part with a life measured in years rather than decades.
Gelcoat
The pigmented resin surface layer moulded onto the face of a fibreglass shell. It is what fades and chalks with age, and refinishing it is the fibreglass equivalent of replastering a concrete pool.
Salt chlorinator
A cell that makes chlorine from dissolved salt as water passes through it. The pool is still chlorinated; the difference is that the chlorine is generated on site instead of bought in a bucket, and the cell itself is a wear part.
Pool enclosure
In Ontario law, the barrier that stops a child reaching the water: the fence, its gates and their latches. Toronto issues a pool fence enclosure permit for it, and the pool cannot be filled until an inspection confirms it complies.
Resurfacing
Renewing the interior finish of a pool without touching the structure behind it: replastering a concrete shell, refinishing a fibreglass gelcoat, or replacing a vinyl liner. It is the reason a renovation quote and a rebuild quote can describe the same pool and differ by an order of magnitude.

What should I read next?

Related guides

Frequently asked questions

How much does a pool renovation cost in Toronto?

Swimpool 360, which services Toronto and the GTA, prices a comprehensive renovation covering liner, deck, coping and equipment at $15,000 to $30,000, and a full makeover at $20,000 to $50,000. Individual pieces are much cheaper on their own: a vinyl liner replacement runs $3,500 to $7,000 and deck and coping work starts around $5,000.

What does it cost to replace a vinyl pool liner in the GTA?

Ontario sources put it between roughly $2,500 and $10,000 depending on pool size. Swimpool 360 quotes $2,500 to $5,000 on its liner repair page and $3,500 to $7,000 on its renovation page, Nebo's Pools in Pickering advertises from $4,500 and cites $3,000 to $7,000, and Hipel Pools in Kitchener quotes $4,500 to $8,000 for a standard pool and $6,500 to $10,000 and up for larger or custom shapes. Hipel Pools puts liner life at 8 to 12 years.

How much does it cost to resurface a concrete pool in Ontario?

Swimpool 360 prices concrete pool resurfacing at $6,000 to $18,000 depending on the surface type chosen, and Project Landscaping puts installed replastering at $6,000 to $15,000. Easy Pools says concrete pools need resurfacing every 10 to 20 years. Fibreglass is cheaper to refinish, at $3,000 to $8,000 for gelcoat work every 15 to 20 years.

What does a new pool deck cost in Toronto?

For a 600 to 900 sq ft deck, 905 Reno prices 2026 Toronto work at $3,500 to $6,800 for a refresh and reseal of existing concrete, $9,000 to $15,500 for a full stamped concrete re-pour, $14,500 to $22,000 for travertine pavers laid over an existing base, and $19,000 to $32,000 for a new deck with base prep in 20 mm porcelain pavers.

Is it cheaper to renovate a pool or replace it?

Renovate, in almost every case. Swimpool 360 puts a complete pool replacement in the GTA at $50,000 to $100,000 and up, against $15,000 to $30,000 for a comprehensive renovation that covers liner, deck, coping and equipment. Replacement only makes sense when the shell itself has failed.

Do equipment upgrades pay for themselves during a renovation?

A variable-speed pump can. Swimpool 360 states the saving is $600 to $1,200 annually on electricity with payback in 2 to 3 seasons, and GBI Pools reports Ontario owners save $300 to $500 a year on hydro after switching, noting a single-speed pump can cost over $1,000 in electricity each summer in Ontario.

Do I need a permit to renovate a pool in Toronto?

It depends what you touch. City of Toronto Municipal Code Chapter 447 requires a pool fence enclosure permit for a swimming pool enclosure, and the fee is $198.59 per application under Chapter 441. If your renovation removes, replaces or moves the fence, check with the City before work starts, because the City must inspect a compliant enclosure before the pool is filled.

Questions to ask your contractor

  • What did you find when you inspected the shell, and what are you not able to see yet?
  • Is the quote a resurface, a liner, or a full conversion, and what changes if you open it up? Renovation scopes and costs
  • Does the coping, tile and deck edge stay, and does the finish still match if it does?
  • How long is the pool out of service, and what happens if the season closes mid job?
  • What warranty covers the new surface, and what voids it?

Put three GTA quotes for pool renovation side by side

No obligation. Requests reach our desk, never a company.